china Custom 100kw 150rpm 3 Phase AC Low Rpm Permanent Magnet Synchronous Generator Energy Alternator manufacturers

Product Description

Introduction:
Our long lasting magnet generator are normally utilized for wind generation, hydro generation or other new vitality generation.
The everlasting magnet generator does not create energy by by itself but transforms mechanical energy to electrical energy.
 The generator constantly want a primary mover this kind of as wind turbine, hydro turbine, diesel motor or other operating equipment to drive the generator, then the generator consumes the mechanical vitality from the prime mover and output electricity.
We could make low velocity and large speed generators, the primary mover could right travel CZPT generator with out gearbox or pulley, which can make the program a lot more successful and reliable.

The everlasting magnet motor need to have a Variable Frequency CZPT (some folks also call it inverter) to start the motor and change the motor speed. We could make reduced pace motors, could straight travel your reduced pace device with out gearbox or pulley, enhance the system performance a good deal, and save servicing price.

Technical data:

Main technical specs
Rated CZPT (kW) 180kW
Rated velocity (rpm) 83rpm
Rated torque (Nm): 22510Nm
Rated voltage (V): 400VAC
Rated recent (A): 260A
Startup torque (Nm) 450Nm
Number of poles seventy two
Frequency (Hz) 50Hz
Period three-phase
Insulation Course: H
Defense Class IP54
Efficiency(>%) 92%
Energy element one
Cooling Liquid cooling
Mechanical specifications
Installation Vertical
Frame size 560
Bodyweight (Kg) 4700kg
Materials
Shaft content Metal
Housing content Steel
Winding material Copper
Winding temperature degree 180ºC
Magnet NdFeB
Magnet temperature stage 150ºC
Core High good quality cold rolled silicon metal sheet

Are long lasting magnet generators your main items?
Indeed, we create and develop long term magnet synchronous generators (alternators), long lasting magnet synchronous motors(PMSM),controllers, inverters, load box and other corollary equipment and accessories.

How CZPT does it take to complete my get? 
Typically your purchase CZPT supply in 7-15 days, some sizzling revenue products CZPT CZPT shipped in 1 week. The certain delivery time relies upon on the objects and the quantity of your buy.

Can I get a sample 1st?
Confident, we are honored to offer you sample for examination prior to putting a formal get.

What is your terms of supply?
EXW, FOB, CFR, CIF.

Could you do CZPT ized items or CZPT ?
Indeed, we have design and style capability and we are manufacturing unit. We could make the generator and motor with various rpm, kW, voltage, frequency as you require. We could also do CZPT or ODM if you need.

Can I get a sample very first?
Positive, we are honored to offer you sample for examination before placing a official buy.

How does your manufacturing facility do concerning good quality handle?
Good quality is priority. We always attach great relevance to top quality control from the commencing to the end of the manufacturing. CZPT y merchandise will be entirely assembled and meticulously analyzed ahead of packed.

What is actually your guarantee conditions?
Guarantee: 1 12 months following the shipping and delivery day against B/L.

How do you make CZPT company CZPT -time period and excellent romantic relationship?
We maintain very good high quality and aggressive cost to guarantee CZPT CZPT ers gain We regard every single CZPT er as CZPT good friend and we sincerely do company and make close friends with them, no matter where they arrive from.
 

Idler: A driven wheel that does not transmit electrical power through a shaft. It spins freely, and most pushed pulleys are linked to other equipment, this sort of as wheels or drives, through driveshafts.
china Custom 100kw 150rpm 3 Stage AC Reduced Rpm Permanent Magnet Synchronous Generator Vitality Alternator producers

Tags:150rpm

Recent Posts